Utility Shoring

  • 1 Adaptable shoring layout to protect existing utilities and buildings
  • 2 Adapting to existing utilities
  • 1 Excavation for lift station at lakeside location
  • 2 Excavation of frozen soil face for water intake structure on Yellowstone River
  • 1 Exposed frozen soil for lift station
  • 2 Isolating excavation area from river
  • 1 Shoring for utilities in active rail yard
  • 2 System in place for two phase excavation to different depths
  • 2 Watertight shoring around multiple live utilities
  • 2 Watertight trench for utility installations
We are specialists in providing cost-effective, minimally invasive, impermeable shoring for the installation of lift stations and other underground structures. Freezing is superior to conventional shoring for eliminating lateral groundwater movement into the excavation. Our versatile system can be shaped, as necessary, can incorporate existing utilities so that rerouting is not necessary, and can work around underground obstructions. When dewatering is limited or costly due to quantity to local regulations, soil contaminate treatment, or possible existing structure damage from settlement, the SoilFreeze system is a solution.

Design considerations: Existing utilities or known obstructions are addressed in the design phase by locating vertical freeze pipes on either side of the utility or obstruction or by using angled pipes to
close the shoring wall below. As in all other applications where a “dry hole” is desired, the design engineer analyzes all strata below the groundwater table to determine the depth required for the unfrozen “plug.” Specialized engineering and construction experiences are critical to provide the most cost-effective, successful solution. Freeze pipes installed too deep will add unnecessary costs to your project, too shallow will cause unnecessary dewatering.