SHALLOW EXCAVATIONS
No Natural Groundwater Cutoff at Shallow Depth
Small Site

Ground Freezing For Shoring And
Groundwater Cutoff

Shallow Excavations
Shallow Excavations—Large Site
Deep Excavations
Tunneling
Groundwater Cutoff Wall

  • Can be designed to completely cut off groundwater into the excavation without a natural aquitard.

  • Batter freeze pipe can be installed at any angle to accommodate site space constraints.

  • Can be modified: vertical pipes on one side and batter pipes on the other side.

  • Uplift is controlled by freezing deeper than the excavation depth.

  • Very cost-effective shoring method when contaminated groundwater is present.

  • Can be effectively used to depths of 40 feet or more.